Pre assembly of snorkel legs involves diamond grinding of the mating faces of each brickt.
The mating surfaces of each brick are finally bonded with a minimal quantity of epoxy resin.
The resin bonded brick assembly is finally fixed into the steel can and castable placed around the can outer.
The completed assembly is ready for transportation to the customer.